Water Treatment Plant




 In 2009, a comprehensive facility assessment indicated that the existing treatment plant is at the end of its useful life. The assessment noted that the plant has many critical pieces of equipment for which repair parts are unobtainable, and portions of the plant lack redundancy. Based on a 50-year life cycle cost analysis, the City concluded that the most cost effective and risk minimizing option is construction of a new facility.

Bulkhead Replacement Project

FileTypeSizeUploaded onDownload
Storm Drain Inspection - June 2013PDF1.09 MB18 Mar, 2014 Download
14-12 RFP PACKAGE City Doc 30% PDF913.38 KB18 Mar, 2014 Download
2008 Bulkhead Condition Study and PhotosPDF7.78 MB18 Mar, 2014 Download
Bulk Head Replacement Project - February 2013PDF1.05 MB18 Mar, 2014 Download