Footing (before concrete is poured), foundation wall, backfill, slab on-grades (before concrete is poured), framing inspection, insulation inspection (prior to close-in), and a final inspection are required. Other inspections required: rough electrical, final electrical, rough plumbing, final plumbing, rough mechanical, final mechanical, landscaping and trees, storm water management, storage tanks, and grading inspections.